Notice: Function WP_Styles::add was called incorrectly. The style with the handle "metaslider-blocks-editor-css" was enqueued with dependencies that are not registered: wp-block-library. Please see Debugging in WordPress for more information. (This message was added in version 6.9.1.) in /home/demo_arctictoday/demo.arctictoday.com/wp-includes/functions.php on line 6260
Home Arctic Economy New Greenlandic subsea cable worth $468 million added to Denmark’s Arctic defense deal
Arctic Economy Geopolitics News

New Greenlandic subsea cable worth $468 million added to Denmark’s Arctic defense deal

By Elías Thorsson October 10, 2025
Vivian Motzfeldt, Denmark’s Minister of Defence Troels Lund Poulsen (not seen) and members of the coalition present a defense agreement on the Arctic and North Atlantic in the Ministry of Defence in Copenhagen, Denmark, Monday January 27, 2025 Ritzau Scanpix/Emil Helms via REUTERS

Reported by Greenlandic outlet Sermitsiaq on Friday, Denmark’s forthcoming defense agreement for the Arctic and North Atlantic is expected to include a new subsea cable, added at the last minute, to supplement Greenland’s two existing cables. The cable aims to strengthen critical digital infrastructure in the region while reducing Greenland’s vulnerability to long-term internet outages.

  • New subsea cable added in the final hours of talks, intended to back up and boost capacity alongside the two current cables.

  • Estimated cost: DKK 3 billion (USD 468 million).

  • Deal negotiated with Greenland’s Minister for Foreign Affairs and Research Vivian Motzfeldt (S); press conference was expected Friday afternoon.

  • Other elements reported from leaked notes: new military HQ in Nuuk, purchase of two additional vessels, icebreaker capacity, docking for Arctic deployments, radar in East Greenland, drones, and upgrades at Kangerlussuaq Airport.

  • Inclusion of the cable followed an eleventh-hour meeting during the opening debate between IA MP Aaja Chemnitz and Danish Defense Minister Troels Lund Poulsen (V).

  • Background: Subagreement 1 (January 2025) launched a feasibility study for a North Atlantic cable to deliver faster internet and provide redundancy if existing lines fail; Subagreement 2 builds on this track.

  • Vulnerability cited by researcher Signe Ravn-Højgaard (Digital Infrastruktur): with only two cables, a cut could mean 6–9 months without internet in Greenland; existing cables have ~25-year lifespans, with the first laid in 2008 needing replacement before 2033.

  • Prior Arctic package earmarked DKK 14.6 billion (USD 2.28 billion) for three Arctic ships, two long-range drones and satellite surveillance.

Enjoy reading Arctic Today?

At Arctic Today, we strive every day to bring you reliable information on one of the world’s most dynamic and rapidly changing regions. Independent journalism ensures that stories about Far North communities, businesses, and governments are told without fear or favor. Your support helps us continue our important mission. Become a supporter today and join us in getting the word out on this vital region. Together, we can ensure that the Arctic story is told accurately and responsibly. Arctic Today is a U.S. non-profit organization. Donate to support Arctic Today here.