Sitka Drills 220.1 m of 1.17 g/t Gold from Surface at its RC Gold Project in Yukon
VANCOUVER, BC, Dec. 13, 2021 /CNW/ – Sitka Gold Corp. (“Sitka” or the “Company”) (CSE: SIG) (FSE: 1RF) (OTCQB: SITKF) is pleased to announce assay results from diamond drill hole DDRCCC-21-021 (the “drill hole” or “Hole 21”) from the Company’s 2021 exploration program at its road accessible, district scale RC Gold Project (“RC Gold” or the “Project”) located within the Yukon’s prolific Tombstone Gold Belt (see Figure 1). The drill hole encountered several intervals of elevated gold values from surface to a depth of 220.1 metres (see Table 1 and Highlights below).
Access to content from the Arctic Knowledge Archives is available to Passport holders only.
Arctic Today is a non-profit organization, supported by donations from readers like you. While we strongly believe in giving free access to current news for all readers, we reserve content older than one year for our supporters. All individual contributions of at least $20/month or $150/year will receive a Passport to the Arctic Knowledge Archives. Help us drive the leading non-profit editorial team dedicated to delivering context, information and analysis about events in the Arctic.
Already have a Passport? Sign in
choose your level of support and unlock your Arctic Passport.
- Monthly
- Annually
- Groups & Institutions
Individual Annual
$150.00
Year
Individual Monthly
$20.00
Month
Individual Monthly
$20.00
0
Individual Yearly
$150.00
0






